Last edited by Arazahn
Monday, August 3, 2020 | History

3 edition of Toolbox fire recovery project draft environmental impact statement. found in the catalog.

Toolbox fire recovery project draft environmental impact statement.

Toolbox fire recovery project draft environmental impact statement.

  • 195 Want to read
  • 1 Currently reading

Published by U.S. Dept. of Agriculture, Forest Service in [Lakeview, OR] .
Written in English

    Subjects:
  • Forest fires -- Environmental aspects -- Oregon -- Fremont-Winema National Forests,
  • Forest reserves -- Fire management -- Oregon -- Fremont-Winema National Forests,
  • Forest management -- Oregon -- Fremont-Winema National Forests,
  • Fremont-Winema National Forests (Or.)

  • Edition Notes

    Other titlesToolbox fire recovery project draft environmental impact statement (Online)
    ContributionsUnited States. Forest Service.
    Classifications
    LC ClassificationsSD421.32.O7 T66 2003
    The Physical Object
    Pagination3 v. :
    ID Numbers
    Open LibraryOL16342401M
    OCLC/WorldCa55023138

    Evaluation of the Section permit application is a federal action subject to review under the National Environmental Policy Act of (NEPA). The USACE, Tulsa District has determined that the proposed project will require an Environmental Impact Statement (EIS) prior to . draft environmental impact statement table phase i pre- and post-development runoff from mauka and makai project sites v table phase ii existing runoff from mauka and makai project sites v table department of water supply water system standards, v

    Draft Environmental Impact Statement Page i FACT SHEET PROJECT TITLE Tumwater Brewery Planned Action Environmental Impact Statement (EIS) PROPOSED ACTION The City of Tumwater proposes to adopt an ordinance designating a portion of the historic Tumwater Brewery. COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating agency in the preparation of the Abengoa Biorefinery Project EIS. TITLE: Draft Environmental Impact Statement for the Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas (DOE/EISD) (Abengoa .

    Upgrade Project • Draft Environmental Impact Statement. March EIS Factsheet. Page. ii. Project Proponent. The project proponent is the Tesoro Refining & Marketing Company LLC (Tesoro). The projected date of completion for the proposed project is between and Project Proponent Contact Information. Tesoro Refining. Title of Proposed Project: Klickitat Hatchery Complex Program State Involved: Washington Abstract: The Draft Environmental Impact Statement (EIS) describes proposed changes to production programs for four anadromous fish species sponsored by the Yakama Nation and WDFW in the Klickitat river basin in south central Washington.


Share this book
You might also like
Tikopia string figures [by] Raymond Firth and Honor Maude.

Tikopia string figures [by] Raymond Firth and Honor Maude.

Get by in Welsh

Get by in Welsh

Illinois State plan for the prevention, treatment, and control of alcohol abuse and alcoholism for the fiscal year July 1, 1974 through June 30, 1975.

Illinois State plan for the prevention, treatment, and control of alcohol abuse and alcoholism for the fiscal year July 1, 1974 through June 30, 1975.

The pho cookbook

The pho cookbook

Come back Peter.

Come back Peter.

The founders on God and government

The founders on God and government

LEADING SPIRIT HIGH-TECH (HOLDINGS) CO

LEADING SPIRIT HIGH-TECH (HOLDINGS) CO

Common Market: renegotiate or come out

Common Market: renegotiate or come out

Staphylococcal disease

Staphylococcal disease

The rebel

The rebel

Your assessment center in action, third year, July 1, 1981-June 30, 1983.

Your assessment center in action, third year, July 1, 1981-June 30, 1983.

What Does a Man Want (Sunbird Readers Series, 6, 6)

What Does a Man Want (Sunbird Readers Series, 6, 6)

Sam Francis

Sam Francis

Britain and Spain in America

Britain and Spain in America

Toolbox fire recovery project draft environmental impact statement Download PDF EPUB FB2

Transmittal: This draft environmental impact statement prepared by the Commission’s staff on the hydroelectric license application filed by DWR for Oroville Facilities (FERC Project No. ) is being made available to the public on or about Septemas required by the National Environmental Policy Act of draft environmental impact statement In accordance with Federal civil rights law and U.S.

Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA File Size: 8MB. Draft Environmental Impact Statement Introduction March The elements of the proposed project include constructing additional process units in mostly developed areas within the refinery boundaries and road refinements on North Texas Road adjacent to the refinery to the south.

One of the planned areas within the refinery would require. special status species, socioeconomics, historical resources, and cultural resources. The Draft Environmental Impact Statement will have a day comment period. We will consider all public comments received during the comment period in preparation of.

The Na Pua Makani Wind Energy Project lies on acres of land above Kahuku Town, Koolauloa, Oahu TMK’s (1) and (1) It is surrounded by. Comments on the draft EIS must be received in Washington, DC on or before Decem Once the final EIS is issued, the FERC Commissioners will take into consideration staff’s recommendations when they make a decision on the Project.» Draft Environmental Impact Statement» Appendix A-M» Appendix N-W.

The Federal Railroad Administration (FRA), in cooperation with the Federal Transit Administration (FTA) and in coordination with the Maryland Department of Transportation and the National Railroad Passenger Corporation (Amtrak), completed the Draft Environmental Impact Statement (DEIS) and Section 4(f) Evaluation for the B&P Tunnel Project.

Federal Register: Notice of Availability and Notice of Public Meeting for the Draft Environmental Impact Statement (DEIS) for the Green Bank Observatory, Green Bank, West Virginia Draft EIS. Draft Environmental Impact Statement; Appendices to Draft Environmental Impact Statement; Public Comment Meeting: NSF hosted a public meeting to address the DEIS.

The meeting will be. Hudson Tunnel Project. The Project is intended to preserve the current functionality of the Northeast Corridor’s (NEC) Hudson River rail crossing between New Jersey and New York and strengthen the resilience of the NEC.

The EIS is being prepared pursuant to the National Environmental Policy Act of (NEPA). As appropriate, FRA and NJ TRANSIT will coordinate with Amtrak and the Port. I Draft Environmental Impact Statement I ENVIRONMENTAL IMPACT STUDY SUMMARY Description of the Proposed Project I, the main north-south roadway through Oakland County, is experiencing congestion in the peak periods that will get more severe and extend through greater portions of the day as the future unfolds.

Preliminary Draft Design Report/Draft Environmental Impact Statement. On Apthe New York State Department of Transportation (NYSDOT) released a preliminary Draft Design Report/Draft Environmental Impact Statement (DDR/DEIS) in advance of FHWA review for the Interstate 81 Viaduct Project.

deliveries, river flows, and related environmental conditions in the study area. S.3 Intended Use of Environmental Impact Statement 37 The purpose of an Environmental Impact Statement (EIS) is not to recommend approval or rejection of a project, but to provide information to aid the public.

Draft Environmental Impact Statement - Cover and Table of Contents - March Author: WSDOT Subject: Alaskan Way Viaduct and Seawall Replacement Project Keywords: SR 99 Alaskan Way Viaduct environmental EIS draft Created Date: 3/24/ AM. Draft Environmental Impact Statement R:\Projects\RMV\J\EIS\ Cultural-Novdoc Chapter Watershed Existing Conditions Cultural Resources and may participate.

Interested (federally recognized) Native American tribes, local governments, and other parties are provided the draft materials and are invited to be concurring.

Abstract: This Draft Environmental Impact Statement (EIS) has been prepared to analyze and disclose the estimated environmental effects of implementation of the Breckenridge Ski Resort Peak 6 Project.

Breckenridge Ski Resort is located on the White River National Forest in Summit County, CO andFile Size: 9MB. Date of Issue of Draft Environmental Impact Statement. J Commenting on the Draft EIS. The Draft EIS will be available for an extended comment period of 60 days (45 days are required).

The comment period will begin on J Comments on the Draft EIS can be made in writing, by e-mail, or at the public hearings. All comments. COMMENTS ON DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR BISCUIT RECOVERY PROJECT.

in the Biscuit Fire Recovery Project DEIS (October, ) and with a specific focus on activities in Late Author: Jerry F.

Franklin. Central Arizona Project Allocation Administrative Draft Environmental Impact Statement Appendix A – Background Assumptions Table of Contents Page # I.

INTRODUCTION A-1 II. LIST OF KEY ASSUMPTIONS A-3 A. CAP Diversions and Available Colorado River Water A-3 B. Water Priorities A-4 C. Indian Development Schedule and Water Use A Home» EIS Draft Environmental Impact Statement DOE issued a Draft EIS that evaluates the potential environmental impacts of a proposal by Northern Pass Transmission, LLC (Northern Pass) to construct, operate, maintain, and connect a high voltage direct current electric transmission line that would cross the U.S./Canada border in.

GOSR is pleased to provide the Notice of Availability and links to the Draft Environmental Impact Statement (Draft EIS) below for the Coastal and Social Resiliency Initiates for Tottenville Shoreline project. The environmental review has been prepared in accordance with NEPA. Public Review: Public viewing of the DEIS is available online at.

This Draft Environmental Impact Statement (Draft EIS) analyzes the environmental impacts of fuel economy standards and reasonable alternative standards for model years passenger cars and light trucks (“light-duty vehicles”) that NHTSA has proposed under the Energy Policy and Conservation.The Project has the potential to have a significant impact on the following matters of National Environmental Significance (NES) that are protected under Part 3 of the EPBC Act: Listed threatened species and communities (sections 18 and 18A).

On 27 Junethe Proponent formally withdrew the MMP from the NT EPA assessment process.MRM Overburden Management Project EIS B-1 B. Terms of Reference Cross-reference Table B.1 Introduction The following table lists how the specific Terms of Reference (TOR) requirements have been addressed in the Environmental Impact Statement (EIS) as outlined in Section of the TOR.